Detailed Engineering Studies, Construction Supervision and Contract Management of the Odaw Channel: Lot 1, Lot 2, Lot 3.

 

Background  
The project, which is a component of the Accra and Sekondi Takoradi Drainage Project, comprised feasibility studies, detailed design and construction supervision of the main Odaw channel and secondary channels in Accra. This was to create a definite channel for the Odaw River and to reduce the effect of flooding in the environs of the river especially in the Alajo and the Avenor areas which are the worst hit areas by flood.

 

The scope of services provided by Comptran included the following:

Feasibility studies

Detailed design of Odaw drainage channel and secondary channels in Accra

Undertaking all pre-contract activities required for tendering, award and signing of contract

Supervision of construction works